The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Quick Early-stripping Slab Formwork -

KITSEN Early·stripping Slab Formwork is an advanced aluminum panel·prop·formwork system which allows early stripping operation. 2. Product Parameters: 1) Product Name: Kitsen Fastform System. 2) Material: Aluminum Alloy 6061·T6: Birch Plywood. 3) Specification(mm) of Panel: 1800×1200mm (various size for selecting)

MEVA HN Slab formwork system - MEVA Formwork Systems

The fast, efficient, labor-saving solution for concrete slab construction. The MEVA HN slab forming system features drop heads for early stripping with primary beams (H) and secondary beams (N) that create effecient grid work and adapt to varying layouts – saving time, labor, and costs on the job site.

Zolo Aps60 Aluminium Frame Slab Formwork - Zolo

Zolo Aluminium Panelized Early Stripping Slab Formwork System for solid or lightened slabs,ensuring superior concrete finishing| Quick erection and dismantling due to aluminium structure and fast stripping system and always ensuring highest safety standards for the worker|

How Early Can Formwork Be Stripped?| Concrete Construction

Balancing such risks against cost savings is the subject of a recent technical report by the Cement and Concrete Association on "!Mechanical Damage to Concrete by Early Removal of Formwork."! Research was conducted on factors that affect the earliest time that forms can be removed without damaging the concrete.

Early stripping of slab formwork according to Russian

Early stripping with activation of the slab the formwork is removed when the slab can bear its own dead weight; All the props are stress-relieved! deflection of the slab estab-lishes itself and the floor-slab is 'activated' ready to transfer further loads; Early stripping without activa-tion of the slab the formwork is removed section by section;

Factory Direct Early Stripping Slab Formwork T-form System

Factory Direct Early Stripping Slab Formwork T|form System ` Find Complete Details about Factory Direct Early Stripping Slab Formwork T|form System`Slab Formwork System`Concrete Formwork Shoring System For Slab`Easy Erection Slab Formwork from Formwork Supplier or Manufacturer|Changsha Xiangjia Metal Material Trading Co!` Ltd!

Slab formwork Dokadek 30 -

Dokadek 30 combines the advantages of a panel floor formwork system with those of Dokaflex floor;slab formwork. its 32 sq.ft. large panels make it fast in typical zones, yet – thanks to Dokaflex – it is quick and flexible in the infill zones as well. Dokadek 30 – with or without drop head. the evolution of floor;slab formwork.

Shoring Systems | Concrete Support

The system’s modular nature simplifies the entire process, naturally creating a 1,8m grid, The simplicity in use, combined with the system’s drop-head, allows for early stripping and re-use of slab formwork, thus enhancing site productivity while maintaining automatic back propping,

Aluminum Shoring Props System with Early Stripping - Aluminum

Aluminum Shoring Props System with Early Stripping. ! Aluminum 12K with Early Stripping System provides simple but cost-effective solution for flat slab or slab with drop beams. ! This system can offer the early stripping. After pouring concrete. just remove the aluminium beams to next casting area and keep the shoring prop to support the slab. so this is an economical solution for the user.